The old building of the Austrian “Worker Association” Ried im Innkreis is currently being rebuilt at the same place. The new building with three building sections is based on the surroundings and comprises two floors including an underground car park with around 80 parking spaces. The company Kieninger Wels has been commissioned to carry out the work on the shell. The tried and tested Flex formwork from RINGER was used to form the floor slabs. Columns were executed with the PAX column formwork.
Foreman Thomas Nagl is particularly impressed by the Master PRO wall formwork that can be operated from one side. “The Formworking and stripping goes particularly quick thanks to the operation from just one side. The concrete picture is very good! The Master PRO is a formwork that can be built on.”